For the use of Dry-type
Transformer, installation is an important part, If not correctly installed, it will naturally affect everyone's electricity, or even affect the whole piece, the whole area of resident electricity, so in the installation above, ask an electrician to do the operation, and avoid people who don't know how to do it at will.
Before installation, a small environment should be set up safely, that is, the circuit in an area should be temporarily closed by the switch, so as to open a non-powered safe environment for the operator to be able to install. This is important, and it cannot be installed when there is electricity.
In the process of installation, we should pay attention to the changes in the actual application of
Transformer, such as Dry-type Transformer used alone and group use, their line distribution is not the same, we should be installed according to the actual situation to pull the line.
After the installation, it can not be energized immediately, but should use a standby small power supply for a test, with a capacitor pen to test the input and output voltage of the
Transformer, to achieve the standard performance, the installation is normal, and the function is normal, then the entire installation can be finished.
In the process of use, please pay attention to good protection.