(1) After the high-voltage
switchgear is closed, check whether the closing fuse is normal. If it is replaced, check whether the capacity meets the requirements.
(2) For the pneumatic operating mechanism, drain water according to regulations.
(3) In winter, check whether the heating device is normal.
(4) The personnel on duty should report the defects in time and keep records.